5 Marla House Construction Cost, Time & Process in 2026

Building a 5 marla house is one of the most popular choices for families in Pakistan due to its affordability, efficient use of space, and suitability for urban housing societies. In 2026, construction costs, timelines, and building practices have evolved due to inflation, updated by-laws, rising material prices, and modern construction techniques.

This detailed guide explains the 5 marla house construction cost, time, and complete process in 2026, helping homeowners make informed decisions, plan budgets accurately, and avoid common mistakes.


H2: What Is a 5 Marla House?

A 5 marla plot typically covers 1,125 square feet. Depending on the housing society and local by-laws, covered area and floor plans may vary.

Typical Features of a 5 Marla House

  • 2–3 bedrooms
  • TV lounge
  • Kitchen
  • 3–4 bathrooms
  • Car porch
  • Staircase (for double-storey)

H2: Factors Affecting 5 Marla House Construction Cost in 2026

Construction costs in 2026 depend on several key variables.

Major Cost Influencing Factors

  • Location (Lahore, Islamabad, Karachi, etc.)
  • Soil condition
  • Covered area
  • Quality of materials
  • Labor rates
  • Design complexity
  • Single vs double storey
  • Grey structure vs turnkey construction

H2: Covered Area of a 5 Marla House

House TypeApprox Covered Area
Single Storey900 – 1,050 sq ft
Double Storey1,700 – 1,900 sq ft

Covered area plays a major role in determining overall construction cost.


H2: 5 Marla House Construction Cost in 2026

Average Construction Cost Per Square Foot (2026)

Construction TypeCost per Sq Ft (PKR)
Grey Structure3,200 – 3,800
Standard Finishing4,500 – 5,500
Luxury Finishing6,000 – 7,500

H2: Total 5 Marla House Construction Cost (2026)

Estimated Cost Breakdown

Construction StageEstimated Cost (PKR)
Grey Structure55 – 65 lakhs
Standard Finishing30 – 40 lakhs
Luxury Finishing45 – 60 lakhs
Total (Standard)85 – 1.05 crore
Total (Luxury)1.1 – 1.3 crore

Note: Prices vary by city and material selection.


H2: Grey Structure Cost of 5 Marla House (2026)

Grey structure includes all structural components without finishing.

Grey Structure Includes

  • Foundation
  • RCC work
  • Brickwork
  • Roofing
  • Plaster (internal & external)
  • Basic plumbing & electrical conduits

Grey Structure Material Chart

MaterialApprox Quantity
Bricks85,000 – 95,000
Cement Bags900 – 1,000
Steel (Sarya)3 – 4 tons
Crush2,500 – 3,000 cu ft
Sand2,000 – 2,500 cu ft

H2: Finishing Cost of 5 Marla House (2026)

Finishing transforms the grey structure into a livable home.

Finishing Includes

  • Flooring
  • Woodwork
  • Paint & ceiling
  • Electrical fixtures
  • Plumbing fixtures
  • Kitchen & wardrobes
  • Doors and windows

Finishing Cost Comparison Table

Finishing TypeCost Range
Economy25 – 30 lakhs
Standard30 – 40 lakhs
Luxury45 – 60 lakhs

H2: 5 Marla House Construction Process – Step by Step

H3: Step 1 – Plot Inspection & Soil Test

  • Soil testing ensures structural safety
  • Helps determine foundation depth

H3: Step 2 – Architectural & Structural Design

  • Floor plan
  • Elevation
  • Structural drawings
  • Approval from society authority

External Link: https://www.pakistanengineeringcouncil.org


H3: Step 3 – Excavation & Foundation

  • Layout marking
  • Excavation
  • PCC & footing work

H3: Step 4 – Grey Structure Construction

  • Columns & beams
  • Slab casting
  • Brick masonry
  • Staircase construction

H3: Step 5 – Roofing & Plaster

  • RCC roof slab
  • Waterproofing
  • Internal & external plaster

H3: Step 6 – Electrical & Plumbing Work

  • Concealed wiring
  • Plumbing pipelines
  • Drainage system

H3: Step 7 – Finishing Works

  • Tiles & marble
  • Paint & false ceiling
  • Doors & cabinets
  • Sanitary installation

H3: Step 8 – Final Inspection & Handover

  • Quality checks
  • Utility connections
  • Final cleaning

H2: Time Required to Build a 5 Marla House in 2026

Construction Timeline Chart

StageTime Duration
Design & Approval1 – 2 months
Grey Structure4 – 5 months
Finishing Work3 – 4 months
Total Time8 – 11 months

H2: Single Storey vs Double Storey – Cost Comparison

FeatureSingle StoreyDouble Storey
Covered AreaLowerHigher
Construction CostLowerHigher
Space UtilizationLimitedBetter
Future ExpansionDifficultEasier

H2: Construction Tips to Reduce Cost in 2026

  • Finalize design before starting
  • Use standard material brands
  • Avoid unnecessary design changes
  • Hire an experienced contractor
  • Purchase materials in bulk
  • Maintain strict site supervision

H2: Common Mistakes to Avoid

  • Starting without approved drawings
  • Poor contractor selection
  • Ignoring soil test
  • Using substandard materials
  • No written contract

H2: Importance of Hiring a Professional Construction Company

A professional company ensures:

  • Cost transparency
  • Quality control
  • On-time completion
  • Compliance with building by-laws

Internal Link Example: https://www.alhassnbuilders.com