1. Introduction to 5 Marla House Construction

A 5 Marla house is one of the most popular residential plot sizes in Pakistan, especially in cities like Lahore, Islamabad, and Karachi. Understanding the construction cost before starting your project helps you plan your budget, choose the right materials, and avoid unnecessary expenses.
Typically, a 5 Marla plot equals 125 square yards or around 1125 square feet of covered area per floor.


2. Factors Affecting the Construction Cost

Several key factors determine the final cost of building a 5 Marla house:

  • Location: Construction rates vary between cities and even among different housing societies.
  • Design Complexity: More intricate designs require higher costs for both materials and labor.
  • Material Quality: Premium tiles, paints, and fittings increase finishing costs.
  • Labor Charges: Rates differ depending on city and contractor experience.
  • Inflation: Building material prices change frequently due to market trends.

💡 Tip: Always get quotations from multiple suppliers to find competitive prices.


3. Grey Structure Cost for a 5 Marla House

The grey structure includes the basic framework: foundation, walls, roof, and plaster.
Average cost in 2025 (approx.):

  • PKR 2,500 to 3,500 per sq. ft.
  • Total Grey Structure Cost: PKR 1.5 to 2.3 million

How to execute this phase:

  1. Foundation Work: Use A-class bricks, cement, and gravel for strong footing.
  2. Structure: Install quality steel (60-grade) and cement for beams and columns.
  3. Roofing: Ensure proper curing and waterproofing for durability.

4. Finishing Cost for a 5 Marla House

The finishing phase adds aesthetics and functionality.
Average cost: PKR 4,000 to 4,800 per sq. ft.
Total Finishing Cost: PKR 4.5 to 5.5 million

Includes:

  • Paintwork and false ceiling
  • Flooring (tiles/marble)
  • Electric and plumbing fittings
  • Kitchen and bathroom accessories
  • Woodwork (doors, cabinets, wardrobes)

💡 Execution tip: Choose local tiles or laminate flooring to balance quality and cost.


5. Material Cost Breakdown

Here’s a general material cost breakdown for a 5 Marla house in 2025:

MaterialEstimated Cost (PKR)Notes
Cement1,450 per bagUse top brands like DG, Maple Leaf
Bricks18–25 per brickA-class or kiln-fired
Steel (60-grade)275–295 per kgReinforcement bars
Sand15,000–22,000 per trolleyRavi or Chenab sand
Crush160–210 per SftFor foundation & roof
Paint350–500 per litreInterior & exterior

💡 Execution tip: Buy in bulk directly from dealers for discounts.


6. Labour and Contractor Charges

Labour costs depend on experience and contract type:

  • Per square foot labour rate: PKR 550–750
  • Turnkey contract: PKR 6,000–7,500 per sq. ft. (includes everything)

Execution tip: Always sign a written agreement with timelines and penalty clauses for delays.


7. Cost Difference: Single Story vs. Double Story

TypeApprox. Cost (PKR)Area Covered
Single Story6.5 – 7.0 million~1,125 sq. ft.
Double Story9.0 – 10.5 million~2,250 sq. ft.

Double-story homes cost more but maximize plot usage and long-term resale value.


8. Smart Tips to Reduce Construction Cost

  1. Plan early: Finalize the house map before starting construction.
  2. Avoid design changes mid-way: It increases waste and labour costs.
  3. Use local materials: They are cheaper and readily available.
  4. Hire a reliable contractor: A good team avoids costly mistakes.
  5. Buy in bulk: Helps lock prices and prevents inflation impact.

9. Final Estimated Total Cost in 2025

CategoryCost Range (PKR)
Grey Structure3.5 – 4.0 million
Finishing4.5 – 5.5 million
Total Estimated Cost8.0 – 9.5 million

(Approximation based on current 2025 construction rates in major cities.)


10. Conclusion – Plan Wisely, Build Smartly

Building a 5 Marla house in Pakistan requires smart budgeting, planning, and execution. Whether you choose a single-story or double-story layout, focusing on quality materials and trusted contractors ensures durability and comfort for years to come.
Stay updated on market prices and always compare multiple quotes before finalizing decisions.


Quick Summary:

  • Grey Structure: PKR 3.5 – 4.0 million
  • Finishing: PKR 4.5 – 5.5 million
  • Total (2025): PKR 8.0 – 9.5 million